Legislation and Links
www.adene.ptAgency for Energy's mission
promote and carry out activities of public interest
in the energy area.
www.dgge.pt
Directorate General for Energy and Geology
(Ministry of Economy and Innovation)
www.ambienteonline.pt
Site with news and information relevant
about the market environment.
Legislation in force
- Energy Policy
- Energy efficiency in buildings
- Renewable energy - power generation
- Cogeneration
Energy policy
Resolution of the Council of Ministers No. 80/2008 of 20.05.2008
Approves National Action Plan for Energy Efficiency (2008-2015)
Resolution of the Council of Ministers No. 50/2007 of 04.28.2007
Adopting measures to promote and implement the National Strategy for Energy.
Resolution of the Council of Ministers No. 169/2005 of 24/10/2005
Approving the national strategy for energy.
Resolution of the Council of Ministers No. 119/2004 of 31.7.2004
Approves the National Programme for Climate Change.
Resolution of the Council of Ministers No. 63/2003 of 04.28.2003
Approves the guidelines of the Portuguese energy policy and repealing Council of Ministers Resolution No. 154/2001 of 19 October.
Energy efficiency in buildings
Ordinance No. 63/2008 of 01.21.2008
Establishes the values of rate parameters on the bulbs low energy efficiency established by Decree-Law No. 108/2007 of 12 April
Ordinance No. 54/2008 of 01.18.2008
Determines the types and models of light bulbs with low energy efficiency which focuses on the rate established by Decree-Law No. 108/2007 of 12 April
Order No. 10250/2008, DR 69 Series II, of 2008-04-08
Define the Model of Energy Performance Certificates and Indoor Air Quality, issued under the ESA (DL 78/2006 of April 4).
Decree-Law No. 71/2008 of 04.15.2008
Regulates the new management system of Intensive Energy Consumption (SGCIE)
Ordinance No. 461/2007, DR 108 Series of 06/05/2007
Summary: Ordinance No. 461/2007 of 5 June, sets the timing of the implementation of the Energy Certification System and Indoor Air Quality in Buildings (SCE).
Decree-Law No. 108/2007 of 12.4.2007
Establishes an environmental tax on energy inefficient light bulbs.
Ordinance No. 835/2007, DR 69, Series II 07/08/2007
This law sets the fees for recording statements of Regulatory Compliance and Certificates in Energy Energy Agency (ADENE).
Decree-Law No. 78/2006 of 04.04.2006
Approves the National Energy Certification and Indoor Air Quality in Buildings and to transpose into national legislation Directive No. 2002/91/EC of the European Parliament and Council of 16 December on the Energy Performance buildings.
Decree-Law No. 79/2006 of 04.04.2006
Approves the Regulation of Energy Systems for Climate in Buildings.
Decree-Law No. 80/2006 of 04.04.2006
Approves the Regulation of Characteristics of Thermal Performance of Buildings (RCCTE).
Directive No. 2002/91/EC of 12.16.2002
On the energy performance of buildings. Was transposed into national law by Decree-Law No. 78/2006 of April 4, together with the Decree-Law No. 79/2006 (RSECE) and Decree-Law No. 80/2006 (RCCTE ), also April 4.
Renewable energy - power generation
Decree-Law No. 363/2007 of 2 November
Establishes the legal regime applicable to electricity through micro units.
Order No. 201/2008 of 22 February
Fixing the fees charged for services provided for in paragraph 1 of Article 23. Decree-Law No. 363/2007 of 2 November, which establishes the legal regime applicable to electricity through micro units .
Regional Legislative Decree No. 16/2008/M
Adapting to the Autonomous Region of Madeira Decree-Law No. 363/2007 of 2 November, which establishes the legal regime for the production of electricity through small power plants, called micro units.
Rectification Statement No. 71/2007. DR 141 SERIES I 7/24/2007
Have been rectified Decree-Law No. 225/2007 of 31 May, the Ministry of Economy and Innovation, which spells out a series of measures related to renewables set out in the national energy strategy, established by resolution Council of Ministers No. 169/2005 of 24 October, published in the Official Gazette, 1. grades, of 31 May 2007.
Decree-Law No. 225/2007. DR 105 SERIES I 5/31/2007
Proceeds to the achievement of a series of measures related to renewables set out in the national energy strategy, established by the Council of Ministers Resolution No. 169/2005 of 24 October. Amending Annex II of Decree-Law No. 189/88 of 27 May, which regulates the operation of power generation by natural or legal persons under public or private. Can also reworded to Articles 4, 5 and 6 of Decree-Law No. 33-A/2005, 16 February, which has reviewed the factors used to calculate the amount of remuneration for providing renewable energy produced in power, delivered to the grid of the Portuguese Electricity System (SEP) and the definition of procedures for the allocation of available power on the same network and deadlines for obtaining a license for establishment of renewable power. Repeals: (i) Paragraph 2 of Article 12, Article 15 and paragraph 3 of Article 41 of Decree No. 295/2002 of 19 March, (ii) Joint Order No. 51/2004 of 19 December 2003 , published in the Gazette, 2nd series, No. 26, January 31, 2004 - Republic in the Annex, which forms an integral part of this ordinance, Annex II of Decree-Law No. 189/88 of 27 May, with the current wording.
Rectification Statement No. 29/2005. DR SERIES I 74-A 04/15/2005
Have been rectified Decree-Law No. 33-A/2005, the Ministry of Economic Activities and Labor, amending Decree-Law No. 189/88 of May 27, reviewing the factors for calculating the value of the payment for supply of energy produced in power renewable delivered to the grid system electrical Portuguese (SEP) and defining procedures for allocation of available power on the same network and deadlines for obtaining permission to establish for power sources, published in Diário da República, 1st series, No. 33 (supplement) of 16 February 2005.
Decree-Law No. 33-A/2005. DR SERIES 33 I-1, A SUPPLEMENT to 16/02/2005
Amending Annex II of Decree-Law No. 189/88 of May 27, reviewing the factors to calculate the amount of remuneration for providing renewable energy produced in power delivered to the network of Portuguese Electricity System (SEP) and setting procedures for allocation of available power on the same network and deadlines for obtaining a license for establishment of renewable power. Gives new wording to Article 14 (Assignment of power to tender procedure) of Decree-Law No. 312/2001 of 10 December.
Joint Order No. 51/2004. DR 26 SERIES II 01/31/2004
Establishes a set of guidelines, rules and technical and administrative procedures for the development of licensing projects to produce electricity from Renewable Energy Sources (RES). It applies, unless otherwise specified, the production of electricity from renewables following: wind, hydro, biomass, biogas, wave and photovoltaics, and in the case of hydroelectric plants with installed capacity to 10 MW (small hydro or PCH ) applies to anything that does not contradict the Governmental Decree No. 295/2002 of 19 March Repeals: (i) Order No. 11 091/2001, of May 4, (ii) Order No. 006/2001 12 of May 4, (iii) Order No. 583/2001 of 11 June.
Order No. 764/2002 of 07/01/2002
Establishing the tariff applicable to production facilities of electricity at low voltage, licensed under Decree-Law No. 68/2002 of 25 March as well as the provisions relating to the period of vig ~ ence of the modalities of the same tariff.
Order No. 9148/2002 of 15.4.2002
Clarifies the interpretation of the procedures provided for in Decree-Law No. 312/2001 of 10 December concerning the investigation of applications for award of the receiving electricity.
Decree-Law No. 68/2002 of 15.04.2002
Regulates the activity of producing electricity at low voltage, since power to deliver to the public network does not exceed 150kW.
Decree-Law No. 312/2001 of 10/12/2001
Defines the management regime of the reception capacity of electricity networks in the Public Service Electricity System from power plants of Independent Electricity System.
Ordinance No. 416/90 of 06.06.1990
Approves the contract type of purchase of electricity from independent producers by EDP under Decree-Law No. 189/88 of 27 July.
Decree-Law No. 339-C/2001. DR 300-A SERIES I SUPPLEMENT 1 of 29.12.2001
Gives new wording of articles 1 and 6 of Annex I of Decree-Law No. 189/88 of 27 May, in the version amended by Decree-Law No. 168/99 of May 18, in reviewing the regime applicable to the business of power generation within the electricity system independent. Also amends the wording to paragraphs 1, 2, 5, 15, 18 and 32 of Annex II of Decree-Law - Adds a 33 to Annex II to Decree-Law No. 189/88 of 27 May, wording amended by Decree-Law No. 168/99 of May 18. Repealing paragraphs 19, 20, 21, and 22 of Annex II to Decree-Law No. 189/88 of 27 May, in the version amended by Decree-Law No. 168/99 of 18 May.
Decree-Law no. DR SERIES I 284-A 12/10/2001
Defines the management regime of the reception capacity of electricity networks in the Public Service Electricity System from power plants of Independent Electricity System. Repeals: (i) The provisions of Decree-Law No. 189/88 of May 27, as amended as amended by Decree-Law No. 168/99 of May 18, when applied to information management, allocation and expiry of the reception, including those contained in Articles 2, 5, 7, and 8 of Annex I of the decree, (ii) the provisions of Decree-Law No. 538/99 of 13 December, when applied to information, management, assignment and termination of the reception, including those contained in Articles 14, 16, 18 and 19 of that Act.
Decree-Law No. 168/99. DR SERIES IA 115/99 of 18.5.1999
Revises the rules governing the activity of electricity generation under the Independent Electricity System, which is based on the use of renewable resources or industrial waste, agricultural or urban. Gives new wording of articles 1, 7, 9, 22 and 27 of Decree-Law No. 189/88 of 27 May, which establishes the rules governing the activity of electricity generation under the Independent Electricity System, which based on the use of renewable resources or industrial waste, agricultural or urban, as amended by Decree-Law No. 313/95 of 24 November. Approves the Annexes I and II, referred as amended, by this statute, the Articles 7 and 22 of Decree-Law No. 189/88 of 27 May. Repeals articles 10, 11, 19, 23 and 26 of this Review the arrangements for the business of power generation within the Independent Electricity System, which is based on the use of renewable resources or industrial waste, agricultural or urban. Gives new wording of articles 1, 7, 9, 22 and 27 of Decree-Law No. 189/88 of 27 May, which establishes the rules governing the activity of electricity generation under the Independent Electricity System, which based on the use of renewable resources or industrial waste, agricultural or urban, as amended by Decree-Law No. 313/95 of 24 November. Approves the Annexes I and II, referred as amended, by this statute, the Articles 7 and 22 of Decree-Law No. 189/88 of 27 May. Repeals articles 10, 11, 19, 23 and 26 of Decree-Law, with wording amended by Decree-Law No. 313/95 of 24 November.
Decree-Law No. 189/88. DR 123/88 SERIES I 5/27/1988
Establishes rules for the activity of electricity generation by natural or legal persons under public or private. Repeals Law No. 21/82 of 28 July and Decree-Law No. 20/81 of 28 January, with the wording amended by Decree-Law No 149/86 of 18 June.
Cogeneration
Statement of Rectification no 8-B/2002 of 28/02/2002
Have been rectified Decree-Law No. 313/2001, the Ministry of Economy, amending Decree-Law No. 538/99 of December 13, reviewing rules on operating conditions and pricing of the activity of Combined Heat and Power, published in the Official Gazette, 1. grader, No. 284, December 10, 2001.
Decree-Law No. 313/2001 of 10/12/2001
Amending Decree-Law No. 538/99 of December 13, reviewing rules on operating conditions and tariffs of the activity of combined heat and power.
Ordinance No. 57/2002, 58/2002, 59/2002 and 60/2002, all of 15 January
Establish the formulas for calculating the remuneration of the energy supplied to the SEP by the co-generation facilities licensed pursuant to Decree-Law No. 538/99 of December 13, as amended by Decree-Law No. 313/2001 of 10 December.
Order No. 399/2002 of 18.4.2002
Rules on the establishment and operation of cogeneration facilities.
Decree-Law No. 538/99 of 12.13.1999
Establishes the regime for co-generation. Repeals Decree-Law No. 186/95 of 27 July, without prejudice to Article 28.
Ordinance No. 347/96 of 08.08.1996
Establishes technical and safety provisions regarding the establishment and operation of cogeneration facilities.
Decree-Law No. 186/95 of 27.7.1995
Establishes provisions relating to the business of production and consumption combined electricity and thermal energy through the cogeneration process.
Directive No. 2004/8/EC of 11/02/2004
On the promotion of cogeneration based on useful heat demand in the internal energy market and amending Directive 92/42/EEC.
Decree-Law No. 319/2009 of 3 November
Directive No. 2006/32/EC of the European Parliament and the Council of 5 April on the end-use efficiency of energy and energy services, stipulates that member states of the European Union should create conditions to promote and developing a market for energy services and to develop measures to improve energy efficiency destinadasaos consumers.
-
Team FactorEnergia/Ecobasalto Competições
A FactorENERGIA junta-se este ano pela segunda vez no apoio à Ecobasalto competições e à Madeira Inerte para a realização deste campeonato de ralis "coral" 2011.
-
Já é possível vender até 250Kw/h!
Nova Lei da "Minigeração" foi aprovada, permitindo agora aos interessados em investir no sector da energias renováveis produzir e vender até 250 Kw de energia.
-
FactorENERGIA presente em Seminário Internacional
O Dr. Roberto Varela - Director Executivo da FactorENERGIA, foi orador convidado no seminário internacional “Qualidade e Gestão das Instalações Desportivas Públicas” sobre o tema “Consumos energéticos associados e a aplicação de energias renováveis" onde falou sobre o novo quadro legal ECO.AP para promoção da eficiência energética nos edifícios do Estado.
-
Renewable Energy
Renewable energy are inexhaustible sources of energy obtained from the Nature that surrounds us, as the sun or wind, which can be used to produce the electricity that we consume daily. See here how you can become an energy producer and meet some of the facilities that we have made.
Read more... -
Energy Efficiency
Produce their own energy from renewable sources is important, but is also essential to rationalize consumption. In this instance, FactorENERGIA elected two vectors with potential energy savings, very significant and major impact on global energy consumption. These are Induction Motors and Industrial Lighting. Check out this section revolutionary technologies we represent exclusively in Madeira and the Azores.
Read more... -
Energy Certification
Since January 2009 any space destined to live in or services, new or existing, if traded or leased, should compulsorily have an Energy Certificate.
Read more...